Security Lighting

SCHEDULE YL 10 – SECURITY LIGHTING
SUN RIVER ELECTRIC COOPERATIVE, INC.
EFFECTIVE JANUARY 1, 2014

TYPE OF SERVICE:

Single phase at available voltage.

AVAILABILITY:

Available for automatic dusk-to-dawn lighting when cooperative furnishes all material, maintenance and electric energy.

MONTHLY RATE:

Existing
Pole

Additional
Pole

175W Mercury Vapor 

$12.16 

$15.20 

400W Mercury Vapor

 $13.67 

  $16.72 

100W High Pressure Sodium  

    $9.17 

 $11.47 

200W High Pressure Sodium

  $10.31 

$12.61 

Where more than one additional pole must be set at a distance not to exceed 150 feet from the meter pole or transformer pole an additional charge of $1.50 per month per pole will be made and the consumer will pay any additional construction costs.

Consumers may not install anything on a rental light pole.

Sun River Electric Cooperative :: Copyright © :: All Rights Reserved
310 1st Ave S :: PO Box 309 :: Fairfield, MT 59436 :: 406-467-2527 :: 1-800-452-7516
Site Developed in part by Basin Electric Power Cooperative