SCHEDULE A 10 – RESIDENTIAL
SUN RIVER ELECTRIC COOPERATIVE, INC.
EFFECTIVE JANUARY 1, 2010

TYPE OF SERVICE:

Single phase, 60 cycles, at available secondary voltage.

AVAILABILITY:

To all members whose accounts include a residence requiring single phase service for a period of more than six (6) months each year and at less than 50 KVA capacity and with an annual usage of at least 4000 kwh, subject to other rules and regulations of the cooperative.  The total capacity of any single phase motor under this schedule shall not exceed 10 HP without written permission of the Cooperative.

This rate is not available for seasonal or stock well services. 

Members requiring single phase service with capacities exceeding 50 KVA shall be served under the GS Rate Schedule.

MONTHLY RATES:

Base Rate

$27.00/month

Energy (Distribution) Charge

0.04330/kwh

PURCHASED POWER RIDER:

Members in this rate class are also subject to the Purchased Power Rider.  For more information, see Schedule PPR (Purchased Power Rider).

MINIMUM CHARGE:

The minimum monthly charge shall be the higher of the following:

  1. The cost for service as calculated by the rates specified.
  2. $1.00 per KVA installed transformer capacity over 10 KVA for overhead and over 15 KVA for underground, plus the base rate.
Sun River Electric Cooperative :: Copyright © :: All Rights Reserved
310 1st Ave S :: PO Box 309 :: Fairfield, MT 59436 :: 406-467-2527 :: 1-800-452-7516
Site Developed in part by Basin Electric Power Cooperative