Purchased Power Rider
SCHEDULE PPR – PURCHASED POWER RIDER
SUN RIVER ELECTRIC COOPERATIVE, INC.
EFFECTIVE JANUARY 1, 2010
APPLICATION:
This purchased power rider is applicable to electric service furnished under the following rate schedules:
RESIDENTIAL
GREEN ENERGY
SEASONAL
GS-1 SMALL COMMERCIAL
GS-2 LARGE COMMERCIAL
GS-3 TRANSMISSION
IRRIGATION (ALL RATE OPTIONS)
MINUTEMAN MISSILES
MONTHLY RATES:
The purchased power rider is a line item on the member's bill that reflects the approximate wholesale cost of power and energy delivered to the member that Sun River Electric will "pass through" from its wholesale supplier.
The purchased power rider will be set by the Sun River Electric Board of Directors and changed as needed.
Effective January 1, 2010 - Purchased Power Rider $0.04120/kwh

